1. Constructing the digestion line
You receive a complete digestion line consisting of a two-stage biogas system using MT components throughout, from the solids feeder through to the residue storage tank. Oversized components and buildings produce no yield but only cost money. By contrast, our "slim" approach keeps the investment costs as low as possible. And in spite of that, the systems can be expanded later on with a manageable outlay.
We have designed our own components so that these are exactly coordinated in terms of structure and function: that means there are no problems with the interfaces.
You can decide for yourself what scope our work should have: from pure construction of a digestion line through to provision of a turn-key system including all occurring ancillary work, everything is possible..
2. CHP and transformer
The combined heat and power plant is not one of our own components. But thanks to our many years of practical experience, we are very well able to judge which CHP goes best with your biogas system. Framework agreements with the suppliers safeguard our access to the best units on the market.
Many customers have problems in dimensioning the transformer correctly. We supply the matching product including transmission station.
Gas conditioning
MT-Energie offers the full range of biogas technology. This also includes conditioning the biogas in a special plant, as an alternative to turning it into electricity on the spot. Here we work together with a strong partner. The BCM® process on licence from DGE GmbH Wittenberg separates the biogas into CO2 and methane by means of non-pressurized amine washing.
3. Initial commissioning
It takes a lot of experience to handle a biogas system. Without doubt it is a challenge for the operator to commission his new biogas system. This is why our staff offers you intensive support during this phase. We pay particular attention to making you familiar with the safety instructions. During on-going operation, it is easy to forget that a biogas system produces explosive gas.
For customers whose biogas systems are approaching completion, we offer operator training courses. All important aspects are explained in manageably sized groups. The courses consist of both theory and practice.
The major subjects covered include:
- Computer-aided system control
- Safety on a gas-producing system
- Biological principles of the digestion process for various different substrates
- Start-up procedure